Red Jacket Wiring Diagram
The red jacket standard control box is the simplest way to control site fueling.
Red jacket wiring diagram. Newly designed features of the red jacket stp are. The units are designed to operate continuousl y at or above minimum flow rate or with an intermittent duty cycle not to exceed 20 on off cycles per hour. Maintain safe reliable efficient fuel flow with red jacket s most basic submersible turbine pump interface. The red jacket stp fuel flow pathway.
The red jacket ump replacement instructions 577014 053 the red jacket 4 submersible turbine pump 380 415v 3 phase 50 hz install operation and service 577014 049 the standard 4 stp petrolem and ag pump install operate and service d042 153. Never wire a submersible pump to run continuously at less than minimum flow rate. Red jacket s unsurpassed expertise helps your customers optimize fuel flow. Red jacket line leak detection systems do not function if the submersible pump runs continuously.
Chapter 2 installation provides safety notices and gives step by step instructions for installing and wiring the pump tandem pumps and control boxes. The standard control box interfaces between the fuel dispenser and the turbine pump and has an indicator light that signals when a customer begins fueling. Service spill elimination. It also describes how to adjust the functional element.
T he motor propels fuel through the ump shell by creating pressure or rotational energy. Chapter 1 red jacket submersible pump describes the basic components of the system. The diffuser collects and directs the flow of liquid into the bottom portion of the ump while the impellers than sling the liquid outward and up through the ump pathway. Installation service and parts list manual for the red jacket submersible turbine pump 577013 843c pdf 577013 843 rev c magnetic starter 30a 120 240v coils wiring guide.
The red jacket submersible turbine pump stp is engineered for advanced environmental protection serviceability safety and flow.